In July 2013 The Rack People successfully bid for a ground-breaking project at Medway Maritime Hospital in Gillingham, Kent. The tender required a range of rack solutions to facilitate deployment of new nodes containing fibre switches which would support a new telephone system and wireless access points. The rack solutions needed to be installed in 28 separate locations around the site.
After visiting the site and working closely with the NHS Project Team, The Rack People identified the best solution for each location. These solutions featured;
In essence there were two types of location, larger peopled areas and smaller spaces.
The peopled areas included staff offices, public areas, waiting areas or day rooms. They needed to have cooling, noise reduction and suitable aesthetics. The Rack People's solution provided;
The small spaces, such as cupboards or store rooms had restricted air-flow and needed a clever cooling solution. Noise reduction and aesthetics did not need to be considered. The Rack People's Solution provided;
Craig Allen, IT Projects and Operational Manager, says, "The Rack People were successful in tendering to provide cabinets and supporting equipment as part of a major network infrastructure refresh at Medway Foundation Trust. Their range of products meant that they were able to provide a range of solutions to support the network across our main hospital building. The project management, delivery and installation of acoustic and ICAS cabinets to the Trust was handled with a high standard of professionalism and a can-do attitude. The Rack People worked with the Trust to provide or engineer products that suited our specific needs and achieve an environment that will support our network throughout its future development and deployment."
Click to Download PDF Version of The Rack People Medway Case Study
Contact us for more information about our cooling rack solutions.