Project
Brief:
Medway NHS required specialist rackmount cabinets to support their major
network infrastructure refresh. Different solutions were needed over 28
locations across the site.
Our
Bid Provided: • Cooling
without major building works • Noise
reduction • Space
savings • Resilience,
monitoring & security
Project
Brief:
Jigsaw24 wanted to deploy IT infrastructure within their new London premises.
With limited time and space they
were delighted to discover more about our
ICAS cooling
rack solutions.
Our
Installation Provided: • No need for a dedicated server room • Scope
for additional infrastructure • Set
up and running cost savings • Quick
installation